Periodic Solid Wire Testing
Every electrical installation deteriorates with use and time and it should be periodically inspected and tested by a competent person. BS7671: 2008 (Requirements for Electrical Installations) recommends every electrical installation is subjected to Periodic Inspection and Testing. More information can be found on the Electrical Safety Council website www.esc.org.uk
A Periodic Inspection reports on the state of the electrical installation within the premises, it details any non-compliances in line with current regulations (IEE 17th Edition BS7671:2008) and the general condition of the wiring, lights and accessories.
RECOMMENDED INTERVALS BETWEEN PERIODIC TEST & INSPECTION |
|
TYPE OF INSTALLATION |
MAX PERIOD BETWEEN INSPECTIONS |
| Agricultural & horticultural | 3 years |
| Caravan Sites | 1 year (compulsory) |
| Caravans | 3 years |
| Churches | 5 years |
| Cinemas & Theatres | 1 year (compulsory) |
| Commercial Premises | Change of occupancy/5 years |
| Domestic Premise | Change of occupancy/10 years |
| Educational Establishments | 5 years |
| Emergency Lighting | 3 years |
| Fire Alarms | 1 year |
| Highway Power Supplies | 6 years |
| Hospitals | 5 years |
| Industrial Premises | 3 years |
| Launderettes | 1 year (compulsory) |
| Leisure Complexes, Places of Public Entertainment | 1 year |
| Marinas | 1 year |
| Petrol Filling Stations | 1 year (compulsory) |
| Public Houses | 5 years |
| Temporary Installations | 3 months |
Please note the maximum interval between Periodic Inspections depends on a number of factors, i.e. age of installation; type of premises; normal life expectancy; level of misuse; extent of wear and tear; etc.
Click here to return to Test and Inspection page
All information supplied is for reference purposes only and may change, please refer to current regulations and guidelines
| Home | | | What we do | | | | | Feedback | | | Location | | | Contact | | |






